Establishing and operating a LEG
As the operator, you bring producers and consumers together in a local electricity community. You organise its establishment, regulate participation and ensure the ongoing operation of the LEG.
Apply for an LEG
Participate in an LEG
Woman wearing glasses at a workstation with several screens in the background
Operator focus
What matters when advising on and implementing an LEG
An LEG offers new opportunities, but requires technical, local and organisational clarity.
In a local electricity community, producers and consumers can jointly use locally produced solar power. Unlike with a ZEV or vZEV, this is not self-consumption behind a shared connection or interconnection point: an LEG uses the public distribution grid and therefore requires a clear grid-topological and regulatory classification.
Substation with overhead lines in a green agricultural landscape under a blue sky
Check technical and local requirementsBefore you establish an LEG, clarify which locations and participants are eligible and whether the requirements for a joint LEG are met.
To the LEG map
Your responsibilities
What you take on as the operator
Operating a LEG involves various organisational and administrative tasks. Plan sufficient time and resources for this. You organise and manage the LEG and are responsible, among other things, for participants, contracts, internal billing and changes during operation.
01Organise participants and contractsYou look for potential participants and conclude a private-law contract with all parties involved. Also ensure that all participants have a myBKW account. If they do not yet have one, they must create it before registering.02Establish and manage an LEGYou create your LEG in the BKW LEG Portal and record changes, such as participants joining and leaving.03Bill electricity within the LEGYou are responsible for billing the electricity exchanged within the LEG. This also includes payment arrears and debt collection.04Comply with legal requirementsAs the operator, you are responsible for complying with the legal requirements applicable to your LEG.
Data exchange and billing
Apply for an EIC number for billing data
For billing your LEG, BKW provides you with the required metering data in EBIX format. To receive this data, you need an EIC number.
You apply for the EIC number from the national grid company Swissgrid. BKW can then provide you with the relevant data for billing your LEG electronically.
Apply for an EIC number
Downloads
Documents for your LEG
Here you will find important documents for setting up and operating your LEG.
LEG model contract
Download
Billing data | Difference between CSV and EBIX format
Download
BGB Local Electricity Community
Download
Frequently Asked Questions
Answers for operators
Key information about maps, local boundaries, requirements, smart meters and billing.
These answers support specialist partners in the preliminary assessment and in customer consultations.
Do you have questions about the grid topology, smart meters, registration or metering data? Send us your enquiry using the form. We will be happy to support you with any questions relating to your LEG.

0/500

Send

Please fill in all required fields correctly.

FacebookLinkedInInstagramLegal informationData protectionImprintGTC & legalPrivacy settings