Commission an independent inspection body
Owners commission an independent inspection body to carry out the periodic inspection. The inspection body must not have been involved in the planning, construction, modification or maintenance of the installation to be inspected. Search for safety advisors
Submit safety certificate
Owners are responsible for ensuring that the grid operator receives the safety certificate with the measurement and test report in good time. The certificate must be retained at least until the next inspection.
Verify the installation independently
The inspection body checks all installations in the building in accordance with the applicable legal provisions and standards. If the installations are free of defects, it issues the safety certificate with measurement and inspection report.
Remedy defects professionally
If the inspection body identifies defects, owners commission a licensed electrical installation company. After rectification, the company confirms completion to the inspection body.
Request safety certificate
The grid operator shall request owners in writing to submit the safety certificate at least six months before the end of the inspection period.