Register solar
Register your PV system and prepare remuneration
In order for your company to feed in solar power and receive remuneration for it, the system must be technically registered, inspected and approved.
Two workers in high-visibility vests are installing solar panels on a roof.
Registration and approval
The process starts before the installation is built
For companies, PV systems are often larger. That is why the grid connection, feed-in capacity, metering concept and remuneration model should be clarified at an early stage.
Registration is usually carried out via your specialist partner. They submit the technical documents and coordinate the necessary steps with BKW. BKW checks whether the desired installation can be operated and feed in at the existing connection. Only after approval, construction, acceptance and the meter/measurement concept can surplus electricity be fed in and remunerated.
Registration process
How companies register their PV system
From the initial assessment to remuneration: the key steps for feed-in and billing.
The exact process depends on the system size, connection capacity, metering concept and desired remuneration model. Your specialist partner will support you with the technical registration.
Step 01Plan system and usageClarify PV capacity, self-consumption, feed-in capacity, battery storage, EMS, charging infrastructure and the desired remuneration model with your specialist partner.Step 02Submit technical connection applicationYour specialist partner submits the necessary technical documents. BKW checks the connection, feed-in capacity and possible effects on the connection line and distribution grid.Step 03Await approval and any conditionsIf grid or connection modifications are required, BKW will inform you about the next steps. For larger systems, this may extend the timeline.Step 04Build the installation and have it inspectedAfter approval, your specialist partner will build the system. Before commissioning, the installation and protection concept are checked and the required documentation is submitted.Step 05Activate metering and remunerationAfter approval and correct metering, surplus electricity can be fed into the grid. Remuneration is provided according to the chosen model, for example feed-in remuneration or purchase remuneration.Step 06Report changes againIf you expand the system later, add storage or change the feed-in capacity, the relevant part of the process must be reviewed again.
Prepare remuneration
Factor in the remuneration model early on
Registration creates the technical basis. Which remuneration model makes economic sense should be examined in parallel.
For companies, feed-in remuneration, dynamic purchase remuneration, guarantees of origin or aggregation models may be relevant. Especially for larger systems with storage or an EMS, it is worthwhile coordinating self-consumption, feed-in times and billing at an early stage.
Frequently asked questions
Questions about registration
Answers about the process, documents and remuneration.
Downloads
Documents for registration and feed-in
Documents that may be relevant in connection with feed-in and remuneration.
The documents required for a specific project depend on the system, output and connection. Your specialist partner coordinates the technical submission.
Brochure: Grid-friendly feed-in control – what system owners need to know
Download
BKW feed-in remuneration
Download
Feed-in remuneration price sheet 2026
Download
Do you have questions about the registration process, feed-in or the remuneration for your company PV system? BKW Customer Service will be happy to assist you.

You can find your customer number either on your invoice or in the myBKW customer portal

0/500

Send enquiry

Please fill in all required fields correctly.

FacebookLinkedInInstagramLegal informationData protectionImprintGTC & legalPrivacy settings