Plug-and-play photovoltaic systems for balconies or patios must be registered with the grid operator. Registration can be completed conveniently using the form on this page.
Good to know
What is a plug-and-play photovoltaic system?
Plug-and-play systems are small plug-in photovoltaic systems that make solar power directly usable in the home.
As an owner – or in consultation with your landlord – you can install a plug-and-play photovoltaic system. The maximum output per meter circuit, for example per single-family home or flat in an apartment building, must not exceed 600 watts. The system must comply with the requirements of the Ordinance on Low-Voltage Electrical Equipment.
Registration is simple: check the requirements, have the documents ready and submit the information using the form.
After registration, BKW checks the details. If a meter replacement is necessary, BKW will contact you. A meter replacement is free of charge, but may cause a brief power interruption.
Check requirements
01
Check requirements
Ensure that the system is approved, has a maximum of 600 watts per metering circuit and that the installation has been clarified with the owner, landlord or municipality.
Have documents ready
02
Have documents ready
Have the contact details, connection location, system output, and the declaration of conformity or a technical data sheet from the manufacturer ready.
Complete the registration form
03
Complete the registration form
Submit the details of the registering person, the connection location and the plug-and-play photovoltaic system using the form.
Wait for feedback from BKW
04
Wait for feedback from BKW
BKW reviews the registration and sets up the remuneration for energy fed back into the grid. If technical adjustments are required, you will be contacted.
Registration
Why registration is necessary
Small plug-in photovoltaic systems also feed electricity into the home grid and must therefore be reported to the grid operator.
By registering, BKW can assign the system to the correct connection, check the technical details and set up the remuneration for energy fed back into the distribution grid. If your system requires a meter replacement, BKW will inform you directly.
Registration
Register your plug-and-play system now
Questions & answers
Frequently asked questions about plug-and-play systems
The key points relating to installation, registration and operation.
Questions about registration?
If you have any questions about the plug-and-play photovoltaic system, registration or the required information, the BKW Customer Service Centre will be happy to help you.