Smart meter or load profile meter
A smart meter or load profile meter is required for the hourly recording of feed-in. Without suitable metering, the existing model of feed-in remuneration remains relevant.
Consciously apply for the switch
The switch to feed-in remuneration is voluntary and is requested via the form. Specialist partners should inform customers in advance about opportunities, price risks and the billing logic.
Compare production and consumption
What matters is when the system generates electricity, when customers need power, and how much surplus is fed into the grid during typical high- or low-price hours.
Shift electricity instead of feeding it in at unfavourable times
A battery storage system can absorb solar power when market prices are low and use it later for self-consumption, peak load reduction or more favourable feed-in times.
Automatically control consumers
An energy management system can align storage systems, charging points, heat pumps, cooling, heat or process loads with production, load profile and spot market prices. EMS and feed-in remuneration
Offset added value against investment
Specialist partners should consider the investment, operating strategy, storage cycles, peak loads, self-consumption and potential price advantages together – not just the PV output.
Benefit from attractive hours
During periods of high demand, electricity fed into the grid can be worth more. Those who manage generation, storage and consumption appropriately can make better use of such time windows.
Reduce feed-in during periods of low prices
At very low or negative market prices, feed-in can be unattractive or incur costs. Storage systems, EMS or inverter control can help respond to this.