Clarify requirements early
Check what your current and future electricity demand is, whether you want to feed electricity into the grid, and whether additional consumers such as charging infrastructure or production facilities will be added later. Check connection capacity
Plan grid feed-in realistically
Companies often install larger PV systems. For this reason, output, feed-in, self-consumption, the metering concept and any grid reinforcements should be reviewed with the specialist partner at an early stage.
Submit technical connection requests
For installations with grid feedback effects – especially larger PV installations, charging infrastructure or high-power consumers – the specialist partner submits the technical connection request.
Coordinate registration forms and metering
After approval, the specialist partner registers the grid connection with BKW, orders the necessary components and clarifies the metering infrastructure, such as meters or instrument transformers.
Check connection and feed-in
BKW assesses whether the connection, the planned capacity and the feed-in of the installation are possible in the existing grid or whether reinforcements will be necessary.
Guaranteeing grid security
After connection, BKW ensures reliable operation, provides grid security and enables billing via the appropriate metering infrastructure.