HouseholdsSolar & self-generated electricityReimbursement for connection line
Connection line refund
Claim back costs for reinforcing the connection line
If the connection line had to be reinforced when connecting a large energy generation plant, costs may be reimbursed under certain conditions.
Technician in orange work clothing working on an open distribution box in a meadow in front of residential buildings.
What applies?
Reimbursement for the line section outside the plot
The refund concerns the reinforcement of the connection line between the plot boundary and the grid connection point.
When connecting a large energy generation system, it may be necessary to reinforce the connection cable. The costs for the cable section between the property boundary and the grid connection point can now be reclaimed using a reimbursement form after completion of the system. The reimbursement amounts to a maximum of CHF 50.00 per kW of installed capacity.
Process
From application to payout
You submit the application to BKW. The further review and reimbursement are carried out in coordination with Swissgrid.
BKW checks the information, supplements it if necessary and forwards the application to the national grid company Swissgrid. Swissgrid decides on the refund and pays the amount to BKW. BKW then passes the refund amount on to you.
01Submit applicationYou submit the application form for reimbursement with the required information and documents.02Audit by BKWBKW checks the information and adds to it if necessary before the application is forwarded to Swissgrid.03Application to SwissgridBKW submits the application to Swissgrid. Swissgrid reviews the application and decides on the reimbursement.04Payment receivedSwissgrid pays the refund amount to BKW. BKW then pays the amount out to you.
Cost estimate
How much can the refund be?
The amount depends on the effective costs and the installed capacity of the system.
Costs for reinforcing the connection line between the parcel boundary and the grid connection point may be reimbursed. The maximum amount is CHF 50.00 per kW of installed capacity. Example: For a capacity of 70 kW, the maximum amount is CHF 3,500.
Application form
Application form
The table cannot yet be fully represented with the currently permitted Payload sections. The complete and binding content is available in Notion.
Contact details
Payment information(Payment will be made to the specified payment address)
Installation
Documents
Send

Please fill in all required fields correctly.

Frequently asked questions
Questions about the reimbursement of the connection line
Answers on requirements, TAG, connection line and payment.
If you have any questions about the application, the requirements or the process, BKW will be happy to assist you. Once the complete application has been submitted, BKW will review the information and forward the application to Swissgrid.

You can find your customer number either on your invoice or in the myBKW customer portal

0/500

Send enquiry

Please fill in all required fields correctly.

FacebookLinkedInInstagramLegal informationData protectionImprintGTC & legalPrivacy settings