Plan and implement PV systems in a grid-friendly way
Grid-friendly feed-in control limits feed-in peaks and provides planning certainty for new PV systems in the BKW grid area.
Download brochure
Technician in orange workwear working on an open distribution box in a meadow in a residential area.
Classification
Peak shaving reduces grid peaks
Specialist partners are the link between end customers, system planning and grid connection.
Grid-serving feed-in control limits peak output from PV systems. New systems should be planned so that they feed no more than 70% of their installed module capacity into the public grid. For customers, the majority of annual production remains usable; this mainly affects a few production peaks on very sunny days.
Content unavailableConsent management is required for this content but is not available on this page.
Implementation variants
Choose the right control system for the installation and the customer’s situation
Depending on the system, self-consumption, storage and control, different technical implementations are possible.
Smiling person in a red roll-neck jumper against a blue sky
Simple limitationThese variants are suitable if the feed-in limitation is to be implemented directly and robustly.
Procedure
How to integrate feed-in control into your project
The regulation should already be taken into account in the dimensioning, quotation and technical submission.
Specialist partners create clarity by informing customers early, choosing the appropriate implementation option and documenting the technical details carefully.
01Assess system and connectionCheck the module output, inverter output, connection capacity, load profile and planned self-consumption.02Select implementation optionSpecify whether a fixed limitation, a control system, a storage system or an energy management system is used.03Advise customersExplain the benefits, technical implementation, potential yield losses and optimisation options transparently.04Submit and documentSubmit the technical specifications in full and document the parameterisation, control and evidence for commissioning.
Technical planning
Understand the 70% limit as a planning parameter
The regulation does not replace the careful design of the system, connection and self-consumption.
The feed-in limit reduces the maximum power that is fed into the public grid. The energy produced can still be consumed locally, stored, or used optimally via an energy management system. Especially for systems with high daytime consumption, charging infrastructure, storage or process loads, curtailment can be significantly reduced.
Frequently asked questions
Answers for specialist partners
Key information on the implementation, consultation and documentation of grid-serving feed-in control.
These answers support specialist partners in planning, customer consultations and technical submissions.
Downloads
Documents on grid-serving feed-in control
The most important information for consulting, planning and implementation.
Use the brochure as a basis for customer discussions and technical clarifications.
Brochure on grid-supportive feed-in control
Download
BKW supports specialist partners with questions about grid-supportive feed-in control, technical submissions, grid connection and implementation in the project.